Bovada bonus codes
bovada casino review
Contact Us
bovada sports betting app Contact Us bovada poker

"*" indicates required fields

bovada sports betting app

The Spanish firm Gamesa Wind, Inc. needed a 250,000 s.f. state-of-the-art wind turbine manufacturing plant in North America up and running in less than six months. Gamesa hired Burns to evaluate an abandoned US Steel Plant that, at first blush, presented great engineering challenges. As an abandoned Brownfield with decaying building infrastructure, it seemed not readily suited for a high-tech plant.

Burns recognized that the facility was a good option for Gamesa, and Bovada bonus codesthat renovating it could save Gamesa millions of dollars and several years from the schedule, in comparison to constructing a new building.

Through innovative engineering solutions and a fast-track project delivery system, Burns took Gamesa from a Brownfield site to production in a six-month time frame. Gamesa was able to meet its production demands, distributing their clean energy turbines throughout the U.S on time.

Burns scaled up its services as the project became more complex, going from a $5 million plant to a $30 million plant. We assisted Gamesa in navigating through the highly regulated U.S. design and construction process. Gamesa now employs more than 300 people and bovada poker reviewhas been recognized by the State and the community for its social, economic and environmental benefits.

This project was awarded the 2007 American Council of Engineering Companies of Pennsylvania Grand Conceptor Award for Engineering Excellence.

Read an article on this project from Philadelphia Business Journal.

Location

Bucks County, PA

Client

Gamesa Wind, Inc.

bovada casino review

Commercial + Industrial