This new experience will be enabled by a new, 635,000 square-foot terminal addition and multi-modal parking and rental car complex that will consolidate operations including ticketing, baggage claim, a meet-and-greet area, security checkpoint, retail and concessions.
The TMP will create a more efficient and enjoyable experience for anyone coming to, passing through, bovada sports betting appor departing from PIT and will reduce travel and wait times for passengers and their bags by utilizing the latest technology.
Burns is responsible for all aspects of IT/Special Systems/Security/Life Safety systems throughout the design of the program including Concept, Schematic Design (SD), Design Development (DD), Construction Documents (CD), and Construction Administration (CA). Specific systems included in Burns’ scope of work are:
Renderings courtesy of Gensler + HDR in association with luis vidal + architects.
Location
Pittsburgh, PA
Client
Allegheny County Airport Authority/ Gensler + HDR in association with luis vidal + architects
Industry
Orlando International Airport, South Terminal C Technology and Multi-Media System Engineering
Houston Airport System, George Bush Intercontinental Airport, Mickey Leland International Terminal, Communications and Technology Design Consultant Services
bovada pokerNew North Terminal at Louis Armstrong New Orleans International Airport